Snipes Solutions LLC — Infrastructure Opportunity Analysis

Memphis Smart Infrastructure
Opportunity Strategy

A site-to-city deployment framework built around funded public infrastructure, Memphis 3.0 anchors, smart-city investment and emerging fiber connectivity.

PROVE

Chelsea Greenline

EXPAND

Southwest Twin

SCALE

107 Memphis 3.0 Anchors

CONNECT

Smart City + Smart Memphis Fiber

$4.285M

Chelsea Greenline project budget

$30M

City CIP schedule — Southwest Twin FY26–FY28

107

Official Memphis 3.0 anchors

$18.72M

Smart City IT01009 project total

Secondary stat:116 fiber anchor sites— Smart Memphis Fiber infrastructure

The Strategy

One City. Four Deployment Stages.

Chelsea Avenue Greenline

Use a defined public-infrastructure corridor to develop a repeatable smart-corridor reference architecture.

Proposed Snipes/SOS solution concepts

Intelligent lightingPedestrian detectionCamerasSmart crossingsEmergency communicationsEnvironmental sensorsNetwork connectivityEdge devicesTraffic/safety integrationsResilient powerRemote monitoring
Priority Project 01 — PROVE

Priority 01 — Chelsea Avenue Greenline

Project Number

PW01255

Department

City of Memphis Public Works

Verified Project Budget

$4,284,780

Funding identified — February 2026 public reporting

Transferred project funding$2,500,000
Grant funding$1,023,000
CIP$761,780
Approx. unencumbered (Feb 2026):~$2,649,000

Status — Reported February 24, 2026

Status:In Design
Procurement:Anticipated bid Q2 FY27
Financial status:~$2.649M unencumbered

Project Timeline

Accelerate Memphis origin
Funding transitioned to CIP
Design
Q2 FY27 anticipated bid
Construction

Why Chelsea First?

  • Physical corridor
  • Defined capital project
  • Safety improvements already within scope
  • Engineering can physically survey the corridor
  • Repeatable architecture
  • Potential model for future trails, greenways and pedestrian corridors

Proposed Smart Corridor Assessment

Proposed Snipes/SOS solution concepts

PowerCommunicationsLightingSafetyPedestrian crossingsCamerasEmergency communicationsIoT sensorsEnvironmental monitoringNetwork backhaulEdge computingCybersecurityMaintenance access

Technology Categories

Intelligent lightingPedestrian detectionCamerasSmart crossingsEmergency communicationsEnvironmental sensorsNetwork connectivityEdge devicesTraffic/safety integrationsResilient powerRemote monitoring
Priority: P1 — Demonstration Candidate

Priority Project 02 — EXPAND

Priority 02 — Southwest Twin Civic Redevelopment

Project

CD01104

Address

4233 South Third St, Memphis, TN 38109

Site Size

Approximately 30 acres

Former Southwest Twin Drive-In site in Westwood, adjacent to Walgreens at Raines.

City CIP Schedule — Verified

FY26

$7.25M

FY27

$11.75M

FY28

$11M

Total

$30M

Shelby County CIP appropriation subsequently approved:$1,548,900

City and County figures are separate identified funding sources and are not combined into a single "total project budget."

City Redevelopment Components

  • Future Memphis Public Libraries Levi branch
  • New Memphis Police Department precinct
  • Civic-campus infrastructure
  • Additional future private development potential

First-Phase Work — Publicly Described

Site preparationGradingUtility installationPavingDrainage improvementsPolice precinct construction

Project Team — Publicly Identified

Construction Manager at Risk

Baldwin & Shell Construction Company

Owner's Rep / Program Manager

Allworld Project Management

Architect of Record

Aaron Patrick Architects

Additional Design Firms

4FDesign, O.T. Marshall Architects

Why Southwest Twin?

Chelsea proves a corridor.
Southwest Twin proves a district.

Priority: P1 — Smart District Candidate

Potential Smart-Site Assessment

Proposed Snipes/SOS solution concepts

Intelligent site lightingPolice/public-safety systemsLibrary connectivityAccess controlCamerasWi-FiResilient networkingSmart parkingDigital wayfindingBuilding controlsPublic-space technologyEV infrastructureCentralized monitoring

Priority 03 — SCALE

107 Memphis 3.0 Anchor Opportunities

Memphis 3.0 is the City's comprehensive planning framework. Its strategy concentrates growth and reinvestment around Citywide and Community Anchors.

The Smart Anchor tier and solution recommendations are Snipes Solutions' proposed assessment framework. They are not official City of Memphis Memphis 3.0 classifications.

Filters

Leaflet © OpenStreetMap, © CARTO
Tier A — Major Smart Anchor
Tier B — Mobility + Safety Anchor
Tier C — Neighborhood Anchor
Tier D — Institutional Anchor

Anchor List

107 of 107 shown

Featured Anchor Clusters

Six High-Potential Geographic Clusters

Whitehaven

Elvis Presley & Shelby Drive
Elvis Presley & Raines
Southwest Tennessee CC
Third & Ford / Raines
Third & Weaver

Potential

MobilitySmart intersectionsLightingPedestrian safetyDigital connectivity

Soulsville / South Memphis

Soulsville
Mississippi & Walker
Third & Crump
Lauderdale & Mallory
Kerr & Gaither

Potential

Public SafetySmart LightingDigital ConnectivityPedestrian Safety

North / Chelsea / Frayser

Chelsea & Thomas
Chelsea & Ayers
Chelsea & Hollywood
Frayser & Watkins
Graham & Chelsea

Potential

MobilityPedestrian SafetySmart LightingPublic Safety

Visually connected to the Chelsea Greenline opportunity.

University / Binghampton

Broad Avenue
Poplar & Highland
Highland Street
Binghampton Gateway
University of Memphis

Potential

MobilityDigital ConnectivityFacilitiesPedestrian Safety

Lamar / Orange Mound

Orange Mound
Lamar & Kimball
Lamar & Airways
Park & Getwell

Potential

MobilityPublic SafetySmart LightingPedestrian Safety

East / Southeast

Poplar & Ridgeway
Walnut Grove & Brierview / Baptist Memorial
Kirby & Raines
Winchester & Ridgeway
Kirby & Winchester

Potential

MobilityFacilitiesFiberEV / MobilityDigital Connectivity

Smart Memphis Fiber

The Connectivity Layer Is Emerging

Verified public facts from June 2026:

85%

Targeted city population availability for affordable fiber broadband

12

Dedicated fiber-optic strands provided to the City

116

Anchor sites throughout Memphis

The City of Memphis announced that its Smart Memphis Fiber partnership with mStreet Fiber includes:

  • Advanced public-safety networks
  • Resilient fiber-backed Wi-Fi
  • Fiber-enabled smart-city infrastructure

A Major Cross-Mapping Opportunity

107

Memphis 3.0 planning anchors

*

116

Smart Memphis Fiber anchor sites

Cross-mapping opportunity

The 116 Smart Memphis Fiber anchor sites are not assumed to be identical to the 107 Memphis 3.0 anchors unless source data proves a specific overlap.

Smart City Capital Program

From Individual Projects to a Connected City

IT01009

Smart City Project

Total:$18.72M
FY27:$3.68M

IT01004

Implementation Modernization

Total:$8M
FY27:$4M

IT01003

Operational Infrastructure Enhancements

Total:$6M
FY27:$1M

IT01002

Cyber Security Infrastructure Upgrades

Total:$2.5M
FY27:$500K

Combined FY27 planned — four programs

$9.18M

This is the arithmetic sum of the FY27 planned amounts of these four listed projects and is not a separate City appropriation or program.

Proposed Architecture Stack

Field Devices
Communications
Fiber / Network
Edge
Cybersecurity
City Platforms
Monitoring + Analytics

SOS / Snipes Solution Framework

Solution Categories

Snipes Solutions — local technology integrator, infrastructure partner and capture/program delivery lead. Smart Optimal Solutions — technology, product and engineering partner.

Smart Mobility

Traffic sensing, intersection technology, pedestrian safety and transportation analytics.

Connected Public Space

Smart lighting, cameras, Wi-Fi, emergency communications and wayfinding.

Smart Facilities

Building controls, access, surveillance, networking, AV and resilient power.

IoT + Edge

Field sensors, environmental monitoring and distributed edge devices.

Communications

Fiber, wireless backhaul and connected-device infrastructure.

Cybersecurity

Zero-trust architecture, secure device management, network segmentation and monitoring.

Operations

Commissioning, monitoring, maintenance and lifecycle support.

Snipes Solutions and Smart Optimal Solutions have not been awarded these projects. Solution categories are proposed concepts; no certifications, product specifications, contractual roles or City approvals are implied.

SOS Product Portfolio

Smart Infrastructure Technology

Smart Optimal Solutions delivers a complete ecosystem of renewable energy and smart city infrastructure products — each designed to work in concert across Memphis anchor sites, transit corridors, and community hubs.

SOS Smart Hybrid Streetlight — Gamma HP

Smart Hybrid
Streetlight System

360° cylindrical PV solar, LiFePO4 batteries, IoT/5G, surveillance-ready — three model lines for every urban environment.

Full Specs
GAMMA
GAMMA·Performance Line

Our unique PV module combined with modern LED light fixtures. For roads, streets, industrial sites, intersections, pedestrian areas, and parking lots.

Height21.32 ft (single) / 27.88 ft (double/HP)
SolarCylindrical PV64 tube, 360° omni-directional, >23% efficiency
Lighting60W–120W dimmable, 48–90 LUMILEDS, up to 23,000 lm
Color Temp4,000 K
ControllerSolar v2 for every LED
ConstructionHot-dip galvanized steel, C5M anti-corrosion finish
SHEMS
SHEMS·Premium Line

Elegance and noble design combined with high luminous output. For parks, residential areas, and parking lots.

Height21.32 ft (single) / 27.88 ft (double/HP)
SolarCylindrical PV64 tube, 360° omni-directional, >23% efficiency
Lighting48–96 LUMILEDS, up to 21,000 lm
Color Temp4,000 K
ControllerSolar v2 for every LED
ConstructionHot-dip galvanized steel, C5M anti-corrosion finish
ROYAL
ROYAL·Decorative Line

Modern technology combined with old-world architecture to honor the past, built for the future. For historical sites, parks, and gardens.

Height24.6 ft (single) / 29.52 ft (double)
SolarCylindrical PV64 tube, 360° omni-directional, >24% efficiency
Lighting60W dimmable, 27 LUMILEDS, up to 8,400 lm per head
Color Temp4,000 K
ControllerSolar v2 for every LED
ConstructionHot-dip galvanized steel, C5M anti-corrosion finish

Cylindrical PV Solar

360° omni-directional energy yield with self-cleaning design and >23% monocrystalline efficiency.

LiFePO4 Batteries

In-pole battery storage. 5-year warranty. Fully off-grid capable with backup power during outages.

IoT & 5G Ready

Smart city compliant. AI-enabled, real-time data integration, redundant connectivity built-in.

Manufacturer's Warranty

25-Year

  • PV Module
  • Pole (C5M corrosion category)

10-Year

  • Pole color durability (Class II)

5-Year

  • Electronics, controller, cabling, LED unit
  • LiFePO4 batteries

Opportunity Matrix

Sortable Opportunity Matrix

PriorityProject / AnchorAddress / IntersectionProgramDepartmentProject #Verified FundingFiscal YearCurrent StatusProposed SolutionDeployment TypeComplexityScalabilitySnipes ScoreSource
P1Chelsea Avenue GreenlineChelsea Avenue CorridorAccelerate Memphis / GreenlineCity of Memphis Public WorksPW01255$4,284,780FY26–FY27In Design — Anticipated bid Q2 FY27Smart Corridor Reference ArchitectureCorridorMediumHigh — repeatable for trails & greenways92CIP / City
P1Southwest Twin Civic Redevelopment4233 South Third Street, Memphis, TN 38109Civic Campus / RedevelopmentCity of Memphis — Community DevelopmentCD01104$30M City CIP (FY26–FY28)FY26–FY28First-phase site work underwaySmart District / Connected Civic CampusDistrictHighHigh — model for civic campuses90CIP / City
P1Memphis 3.0 — 107 Anchor Program107 anchors across 14 planning districtsMemphis 3.0 Comprehensive PlanCity of Memphis — Planning & DevelopmentMemphis 3.0Planning framework (no single appropriation)Ongoing107 anchors officially designatedStandardized Technology-Assessment Packages (Tier A–D)Citywide / ScaleHigh — portfolio approachVery High88CIP / City
P1Smart City Project IT01009CitywideSmart City Capital ProgramCity of Memphis — IT / Smart CityIT01009$18,720,000 project totalFY27 planned: $3.68MFY27 plannedCity Platform / Device IntegrationCitywideHighVery High91CIP / City
P1Chelsea & ThomasChelsea & ThomasMemphis 3.0NorthAnchor 7Planning frameworkOngoingP1 · Tier A / Major Smart AnchorMobility, Public Safety, Smart Lighting, Pedestrian Safety, FiberAnchorHighHigh88Memphis 3.0
P1Chelsea Avenue CorridorChelsea & ManassasMemphis 3.0NorthAnchor 10Planning frameworkOngoingP1 · Tier B / Mobility + Safety AnchorMobility, Smart Lighting, Pedestrian Safety, FiberNodeMediumHigh88Memphis 3.0
P1CrosstownWatkins & ChelseaMemphis 3.0NorthAnchor 11Planning frameworkOngoingP1 · Tier A / Major Smart AnchorMobility, Public Safety, Smart Lighting, Digital Connectivity, FiberAnchorHighHigh88Memphis 3.0
P1Downtown CoreMain & FrontMemphis 3.0CoreAnchor 15Planning frameworkOngoingP1 · Tier A / Major Smart AnchorMobility, Public Safety, Smart Lighting, Digital Connectivity, Fiber, FacilitiesAnchorHighHigh88Memphis 3.0
P1Medical DistrictUnion & ManassasMemphis 3.0CoreAnchor 16Planning frameworkOngoingP1 · Tier A / Major Smart AnchorPublic Safety, Smart Lighting, Fiber, Facilities, Digital ConnectivityAnchorHighHigh88Memphis 3.0
P2Frayser BoulevardFrayser & WatkinsMemphis 3.0FrayserAnchor 1Planning frameworkOngoingP2 · Tier B / Mobility + Safety AnchorMobility, Public Safety, Smart Lighting, Pedestrian SafetyNodeMediumHigh75Memphis 3.0
P2Chelsea & AyersChelsea & AyersMemphis 3.0NorthAnchor 8Planning frameworkOngoingP2 · Tier B / Mobility + Safety AnchorMobility, Smart Lighting, Pedestrian Safety, Public SafetyNodeMediumHigh75Memphis 3.0
P2Chelsea & HollywoodChelsea & HollywoodMemphis 3.0NorthAnchor 9Planning frameworkOngoingP2 · Tier B / Mobility + Safety AnchorMobility, Smart Lighting, Pedestrian SafetyNodeMediumHigh75Memphis 3.0
P2Hollywood & ChelseaHollywood & ChelseaMemphis 3.0NorthAnchor 12Planning frameworkOngoingP2 · Tier B / Mobility + Safety AnchorMobility, Public Safety, Smart LightingNodeMediumHigh75Memphis 3.0
P2Beale StreetBeale & SecondMemphis 3.0CoreAnchor 17Planning frameworkOngoingP2 · Tier B / Mobility + Safety AnchorPublic Safety, Smart Lighting, Digital Connectivity, Pedestrian SafetyNodeMediumHigh75Memphis 3.0
P2South MainMain & CarolinaMemphis 3.0CoreAnchor 18Planning frameworkOngoingP2 · Tier B / Mobility + Safety AnchorMobility, Smart Lighting, Pedestrian Safety, Public SafetyNodeMediumHigh75Memphis 3.0
P2Civic CenterMain & AdamsMemphis 3.0CoreAnchor 20Planning frameworkOngoingP2 · Tier D / Institutional AnchorFacilities, Public Safety, Fiber, Digital ConnectivityFacilityMediumHigh75Memphis 3.0

Click a row to expand full details. Priority scores reflect funding visibility, deployment fit, scalability, timing and physical-site readiness only.

Data / Source Transparency

Sources & Methodology

Methodology

  • Every numeric claim is traceable to a cited official source.
  • Planned CIP values are never labeled as money already spent or contracted.
  • Funding types are distinguished: appropriated, planned, project total, unencumbered, or identified.
  • The 107 Memphis 3.0 anchors and 116 Smart Memphis Fiber sites are not assumed identical without source overlap data.
  • Snipes/SOS technology applications are labeled as proposed concepts.
  • Public priority scores reflect funding visibility, deployment fit, scalability, timing and physical-site readiness only.

This page presents Snipes Solutions LLC's independent infrastructure opportunity analysis and proposed technology concepts based on publicly available City of Memphis planning, budget and capital-project information. Inclusion of a City project, agency or location does not imply endorsement, award, procurement commitment or contractual relationship.

PROVE

Chelsea proves it.

EXPAND

Southwest Twin expands it.

SCALE

Memphis 3.0 scales it.

CONNECT

Smart Memphis connects it.

Build the Memphis Smart Infrastructure Roadmap

Snipes Solutions is evaluating how funded infrastructure, Memphis 3.0 growth anchors, fiber connectivity and smart-city capital investment can support a scalable technology deployment strategy across Memphis.

This page presents Snipes Solutions LLC's independent infrastructure opportunity analysis and proposed technology concepts based on publicly available City of Memphis planning, budget and capital-project information. Inclusion of a City project, agency or location does not imply endorsement, award, procurement commitment or contractual relationship.